Decree No. 112/2009/ND-CP dated December 14, 2009 of the Government on management of work construction investment expenses
09/06/2011
Share |

THE PRIME MINISTER
---------

SOCIALIST REPUBLIC OF VIET NAM
Independence - Freedom Happiness
--------------

No. 112/2009/ND-CP

Hanoi, December 14, 2009

 

DECREE

 

ON MANAGEMENT OF WORK CONSTRUCTION INVESTMENT EXPENSES

THE GOVERNMENT

Pursuant to the December 25, 2001 Law on Organization of the Government;

Pursuant to the November 26, 2003 Law on Construction;

At the proposal of the Minister of Construction,

 

Chapter I

GENERAL PROVISIONS

 

Article 1. Subjects of application

This Decree applies to organizations and individuals involved in the management of investment expenses on the construction of works in projects funded with at least 30% of state capital.

Organizations and individuals involved in the management of investment expenses on the construction of works funded with less than 30% of state capital are encouraged to apply this Decree.

Article 2. Scope of regulation

This Decree provides for the management of work construction investment expenses, including total investment; construction cost estimates of works; construction norms and prices; capability conditions; rights and responsibilities of investment deciders, investors and contractors in the management of construction investment expenses; payment and settlement of investment capital for construction of works funded with state capital, including state budget capital, official development assistance, development investment credit of the State, credit guaranteed by the State and other investment capital of the State.

For works funded with official development assistance (ODA) sources, if treaties to which Vietnam is a contracting party contain provisions on management of work construction investment expenses different from the provisions of this Decree, those treaties will prevail.

Article 3. Principles for management of work construction investment expenses

The management of work   construction investment expenses (below referred to as expense management) must ensure the objectives and effectiveness of work construction investment projects and conform to the market economy mechanism.

Expense management shall be performed for each work in accordance with stages of work construction investment, designing steps, types of capital sources and state regulations.

Total investment and construction cost estimates of works must be projected by correct methods, covering all expense items according to regulations and suit the length of the work construction duration. Total investment is the maximum expense which an investor is allowed to use for investment in the construction of a work.

The State shall perform the management of work construction investment expenses through promulgating, and guiding and inspecting the implementation of, regulations on expense management.

Work construction investors shall bear full responsibility for the management of expenses from investment preparation to completion of construction and putting of works into operation or use.

The provisions of this Decree and work construction investment expenses already approved by investment deciders or investors under this Decree serve as a basis for functional organizations to inspect, examine and audit work construction investment expenses.

 

Chapter II

TOTAL WORK CONSTRUCTION INVESTMENT

 

Article 4. Contents of total work construction investment

1. Total work construction investment (below referred to as total investment (below referred to as total investment) estimated expense determined under Clause 1, Article 5 of this Decree. Total investment serves as a basis for investors to plan and manage capital when making investment in the construction of works.  

2. Total investment covers construction expenses; equipment expenses; expanses for compensation, support and resettlement; project management expenses; construction investment consultancy expenses; other exposes and contingency expenses.         ^

3. Expenses of total investment as specified as follows:

a/ Construction expenses include expenses for construction of works and work items; expenses for demolition and dismantlement of construction works; expenses for construction ground leveling and fill-up; expenses for constitution of temporary and support facilities in Service of construction activities, and of makeshift houses at construction sites for lodging and construction administration;

b/ Equipment expenses include expenses for procurement of technological equipment; expenses for training and technology transfer (if any); expenses for installation, pilot operation and adjustment; expenses for transportation and insurance; and taxes and related charges;

c/ Expenses for compensation, support and resettlement include expenses for compensation for houses and structures built on land and assets attached to land eligible for compensation as regulated and other compensation expenses; supports upon land recovery by the State; expenses for resettlement; expenses for organization of compensation, support and resettlement; expenses for land me during construction(if any); and expenses3Sr investment in the construction of technical infrastructure (if any);

d/ Project management expenses include expenses for project management from the time of project formulation to the time of completion of construction, pre-acceptance test, handover and putting of works into operation and use, and expenses for supervision and evaluation of investment projects;

e/ Construction investment consultancy expenses include expenses for consultancy on survey, designing, construction supervision and other construction investment consultancy expenses.

f/ Other expenses include working capital in the course of trial production for investment projects construction of works for commercial purposes; loan interests in the construction duration| and other necessary expenses;

g/ Contingency expenses include those for arising work volumes and those for inflation factors in-the project implementation duration.

Article 5. Elaboration of total investment

1. Total investment shall be determined by one of the following methods:

a/ Calculating according to basic design, in which construction expenses shall be calculated according to the workload mainly based on the basic design, other workloads as estimated and construction costs suitable to the market; equipment expenses shall be calculated according to quantity and categories of equipment suitable to technological design, market prices of equipment and other elements (if any); expenses for compensation, support and resettlement shall be calculated according to the compensation, support and resettlement workload of the project and relevant state regulations; project management and construction investment consultancy and other expenses shall be determined by making cost estimates or provisional calculation as a percentage (%) of total construction and equipment expenses; contingency expenses shall be determined under Clause 3 of this Article;

For a work for which only an econo-technical report is required, its total investment will concurrently serve as its cost estimate plus compensation, ground clearance and resettlement expenses (if any). The work's cost estimate shall be calculated according to the workload determined in the construction engineering design and Article 9 of this Decree.

b/ Calculating according to the work's area or use capacity and the construction price summed up by structural parts, area and utility (below referred to as general construction prices), the corresponding investment capital ratio for work construction at the time of project formulation, which may be adjusted and added with expenses not yet included in the general construction price and the investment capital ratio for determining the total investment;

c/ Calculating on the basis of figures of implemented projects with similar econo-technical specifications. When using this method, the figures of similar projects must be converted into those at the time of formulating the project and adjusting expense items not yet determined in the total investment;

d/ Combining the methods specified at Points a, b and c, Clause 1 of this Article.

The preliminary total investment of works for which investment reports are required and works to which the form of turn-key contract is applied shall be estimated on the basis of the investment capital ratio or expenses for implemented similar works and expense factors affecting the total investment according to the length of the work construction duration.

The contingency expense for arising workloads shall be calculated as a percentage (%) of the total of expenses specified at Points a, b, c, d, e and f, Clause 3, Article 4 of this Decree. The contingency expense for inflation factors shall be calculated on the basis of the length of the work construction duration and annual construction price indexes relevant to types of construction work, taking into account possible domestic and world market price fluctuations.

Article 6. Appraisal and approval of total investment

1. Appraisal of total investment is part of the appraisal of a work construction investment project, covering the following:

a/ The compatibility of the method of determining the total investment with technical characteristics and technological requirements of the project;

b/ The completeness, reasonability and compliance with practical market requirements of expense items in the total investment;

c/Determination of the total investment value that ensures the effectiveness of construction investment.

2. Investment deciders shall organize the appraisal of the total investment or may hire expense management consultancy organizations or individuals (below referred to as expense management consultancy organizations or individuals) that are qualified under the provisions of Chapter V of this Decree to verify. Appraisal fees or verification expenses shall be included in the total investment. Organizations and individuals appraising or verifying the total investment shall take responsibility before law for the reasonability and accuracy of-appraisal or verification results.

3. The total investment shall be indicated in an investment decision and approved by the investment decider.       *

Article 7. Adjustment of total investment

1. The approved total investment may be adjusted only in the cases of project adjustment specified in Clause 2, Article 1 on the  Law Amending and Supplementing a Number of Articles of the Laws Concerning Capital Construction Investment in which*the total investment is changed (increased or decreased):

2. Investment deciders shall decide whether to approve adjusted total investments.^ case the adjusted total investment does not exceed the approved total investment and results in no change in the site, scope and objectives of a project, the investor may decide to approve the adjusted total investment and take responsibility for such approval.

The difference between the adjusted and approved total investments shall be appraised or verified before approval.

If the adjustment of the total investment under Clause 1 of this Article results in an increase in a project's size (group), the management of such project shall still be performed according to the size (group) of the project already approved before adjustment.

 

Chapter III

WORK CONSTRUCTION COST ESTIMATES

 

Article 8. Contents of work construction cost estimates"

1. Work construction cost estimates (below referred to as work cost estimates) shall be determined for specific construction works and serve as basis for investors to manage work construction investment expenses.

2. A work cost estimate shall be elaborated on the basis of the workloads of jobs determined according to the work's technical design or construction engineering design, tasks to be performed and construction unit prices, and expenses  is calculated as a percentage {%) (below referred to as expense percentage norm) necessary for the performance of such workloads and task.

3. A work cost estimate includes construction expense*S| equipment expenses; project management expenses; construction investment consultancy expenses; other expenses and reserve expenses^

Article 9. Elaboration of work cost estimates

1. A work cost estimate shall be elaborated as follows:

a/ Construction expenses shall be calculated for the work, principal work items and specific jobs of the work and determined by estimation (estimation of construction expenses). For auxiliary and temporary works to serve construction activities, construction expenses shall be determined by estimation; for makeshift houses at construction sites for lodging and construction administration, construction expenses shall be determined as percentage norms;

A construction cost estimate covers direct expenses, overhead expenses, pre-calculated taxable income, value-added tax, and expenses for construction of makeshift houses at construction sites for lodging and construction administration. A construction cost estimate may be determined for each expense item or all expenses.

A construction cost estimate may be elaborated by one of the following methods:

The method of workload and exhaustive work construction unit prices;

The method of total wastage volumes of materials, labor and construction machines and corresponding price tables;

The method of construction expense ratio of works with similar econo-technical specifications already constructed;

Other methods suitable to the nature and characteristics of work construction.

b/ Equipment expenses in a work cost estimate cover expenses for equipment procurement, including expenses for training and technology transfer (if any); expenses for equipment installation, expenses for trial operation and adjustment, and other related expenses (if any);

Equipment procurement expenses shall be determined on the basis of volumes, quantities and categories of equipment to be purchased or processed and equipment purchase or processing prices. Expenses for training and technology transfer, expenses for equipment installation, expenses for trial operation and adjustment and other related expenses (if any) shall be determined by elaborating estimates;

c/ Project management expenses cover expenses necessary for investors to organize project management. Project management expenses shall be determined as expense percentage norms or by elaborating estimates;

d/ Construction investment consultancy expenses cover expenses for consultancy on construction investment project formulation, designing, verification and construction super­vision, expense management and other related consultancy expenses. Construction investment consultancy expenses shall be determined by referring to expense percentage norms announced by the State or by elaborating estimates.

The monthly salary of a consultant shall be determined on the basis of the basic salary level, social expenses, management expenses, profit and other allowances at the average market level or prescribed by the State. In case a consultancy organization has been identified, it shall be calculated and determined on the basis of the actual salary level, social expenses, management expenses, profit and other allowances indicated in the financial statements already audited or certified by a tax of finance agency or in similar contracts already signed or currently performed in the previous fiscal year of such consultancy organization, and the annual salary inflation rate;

e/ Other expenses include expenses not yet specified at Points a, b, c and d, Clause 1 of this Article and shall be determined by elaborating an estimate or as an expense percentage norm;

f/ Contingency expenses for arising workloads shall be calculated as a percentage of the total of all expenses specified at Points a, b, c, d and e, Clause I of this Article. The contingency expenses for price inflation elements shall be calculated on the basis of the length of the work construction duration and annual construction price indexes relevant to types of construction works.

g/ For a work for which only an econo-technical report is required, the total investment is concurrently the work cost estimate. In this case the work cost estimate also includes expenses for compensation for ground clearance and resettlement (if any).

For a project with multiple construction works, the investor may determine the total cost estimate of the project to serve expense management work. The total cost estimate of this project shall be determined by summing up all cost estimates of the works and related expenses under the project.

Article 10. Verification and approval of work cost estimates    

1.       Investors shall organize the verification of work cost estimates before approval. The

verification covers:

a/ Examination of the consistency^ the key estimated workload with the designed workload;

b/ Examination of the properness and reasona­bility of the application of work construction unit prices, expense percentage norms, consultancy expense estimates and estimates of other expense items in the work cost estimate;

c/ Determination of the value of the work cost estimate.

2.         If investors have insufficient conditions or
capability to conduct the verification, they may hire organizations or individuals that satisfy the capability and experience conditions to verify the work cost estimates. Consultancy organizations and individuals verifying work cost estimates shall take responsibility before law and investors for verification results.

3. Investors shall approve work cost estimates (excluding works for which only an econo-technical report is required, which shall be approved by investment deciders) after conducting appraisal or verification and shall take responsibility before law for such approval. Approved work cost estimates serve as a basis for determining prices of bidding packages and construction prices of works and as a basis for negotiation and conclusion of contracts with, and payment to, contractors in case of contractor appointment.

 

Article 11.. Adjustment of work cost estimates

1. A work cost estimate may be adjusted in the following cases:

a/ The cases specified in Clause 1, Article 7 of this Decree;

b/ Case in which the design is allowed to be changed or supplemented but does not contravene the base design or the structure of expenses the cost estimate is allowed to be changed without resulting in an excess of the approved total investment of the work, including contingency expenses.

2. A work cost estimate may be adjusted by the direct offsetting method, the adjustment
coefficient method, the method of adjustment using construction price indexes and other methods. The value of the adjusted part (if any) in the cases mentioned in Clause 1 of this Article shall be separately determined upon addition to the adjusted cost estimate.

3. Investors shall organize the appraisal and approval of adjusted work cost estimates. For a work for which only an econo-technical report is required, if the value of the adjusted work cost estimate does not exceed the value of the cost estimate already approved by the investment decider, the investor may organize the appraisal and approval thereof on its own. If the value of the adjusted cost estimate exceeds the value of the cost estimate already approved by the investment decider, the investor shall report this to the investment decider before organizing the appraisal of the adjusted cost estimate and submit it to the investment decider for approval.

 

Chapter IV

CONSTRUCTION NORMS AND WORK CONSTRUCTION PRICES

 

Article 12. Construction norms

1. Construction norms include econo-technical norms and expense percentage norms.

2. Econo-technical norms establish wastage levels of materials, labor and construction machines necessary for completing a workload unit of a construction job.

3. Expense percentage norms are used for determining costs of some types of job and expenses in construction investment, including project management, construction investment consultancy, site preparation, overhead expenses, other direct expenses, makeshift houses for lodging and construction administration at construction sites, pre-calculated taxable incomes and a number of other jobs and expenses.

Article 13. Formulation and management of construction norms

1. The Construction Ministry shall guide the methods of formulating construction norms and shall announce construction norms.

2. Based on the methods of formulating construction norms under Clause 1 of this Article, ministries and provincial-level People's Committees shall organize the formulation and announcement of construction norms for particular works and jobs of their respective sectors or localities.

3. For construction jobs already included in the system of the announced construction norm system which are, however, not suitable to construction methods and conditions or technical requirements of works, investors, contractors and consultancy organizations shall adjust such norms properly for application to the works.

4. For new construction jobs not yet included in the announced construction norm system, investors, contractors and consultancy organizations shall base themselves on the technical requirements, construction conditions and methods of formulating norms guided by the Ministry of Construction to formulate norms for these jobs or apply similar construction norms applied to other works.

5. Investors may hire consultancy organiza­tions meeting all capability and experience conditions to formulate, adjust and verify the construction norms defined in Clauses 3 and 4 of this Article. The consultancy organizations shall bear responsibility before law and investors for the reasonability and accuracy of applied construction norms.

6. The application of construction norms formulated under Clauses 3 and 4 of this Article to the formulation of unit prices in bidding packages funded with state budget capital and implemented by designated contractors shall be reported by investors to investment deciders for consideration and decision (particularly for construction works under investment projects decided by the Prime Minister, ministers of line ministries and chairmen of provincial-level People's Committees shall make such decision).

Article 14. System of work construction prices

The system of work construction prices includes work construction unit prices and general construction prices. Work construction unit prices shall be formulated for specific works. General construction prices shall be summed up from work construction unit prices. -*"*

The system of work construction prices shall be used for determining construction expenses in total investment and work cost estimates.

Article 15. Formulation of work construction unit prices 

1. Work construction unit price shall be formulated on the basis of market prices  or necessary wastage levels of materials, labor and construction machines for completing a unit workload of construction jobs and specific expense factors related to a work as following:

a/ The prices of construction materials shall be determined to conform to the standards, categories and quality of materials used for a specific construction work. The prices of construction materials shall be determined on the basis of market prices notified by functional organizations, price quotations of producers, price information provided by suppliers or the prices applicable to other works of similar standards and quality. The prices of materials carried to construction sites shall be calculated by the method of formulating work construction unit prices;

b/ The prices of construction labor shall be determined to accurately and fully cover laborers' salaries and comply with the prevailing labor market prices in each region or province and in each obligation to be employed;

c/ The prices of construction machine and equipment shifts shall be determined for each specific work and by the method guided by the Ministry of Construction or to comply with the prevailing market prices.

2 For construction works (including those funded with ODA capital) requiring employment of foreign laborers and use of imported supplies, materials and construction equipment and subject to other particular requirements, their construction unit prices may include additional expense is required by the practical conditions and particularities of the works.

Article 16. Management of work construction prices 

1. Investors shall base themselves on the method of formulating work construction unit prices and specific technical requirements and construction measures of works to organize the formulation of work construction unit prices and general construction prices for use as the basis for determining the total investment and construction cost estimates of these works for expense management purposes.

2. Work construction investors may hire consultancy organizations or individuals fully meeting capability and experience conditions to perform several or all of jobs related to the formulation of work construction prices. The consultancy organizations and individuals shall bear responsibility before law and investors for the reasonability and accuracy of work construction prices they have formulated.

3. Provincial-level People's Committees shall announce prevailing labor and construction machine and equipment shift prices determined according to the method guided by the Ministry of Construction and announce construction labor prices in their respective provinces for use as a reference basis for the formulation of work construction unit prices.

Article 17. Construction price indexes

Construction price indexes are indicators of fluctuation of work construction prices in a given period and serve as a basis for the determination and adjustment of total investment and construction cost estimates of works, construction contract prices and the management of work construction investment expenses.

Construction price indexes shall be determined according to types of works, expense factors and structure, types of main construction materials and regions and announced from time to time. The Construction Ministry shall announce construction price indexes and methods of formulating construction price indexes.

For particular construction works not yet taken into account in construction price indexes announced by the Ministry of Construction, investors may hire qualified consultancy organizations to determine construction price indexes for these works according to the method of price index formulation announced by the Ministry of Construction for use as a basis for the formulation and adjustment of total investment and construction cost estimates of these works, construction contract prices and the management of expenses. The consultancy organizations shall take responsibility for the accuracy and reasonability of construction price indexes they have provided.

 

Chapter V

CAPABILITY CONDITIONS OF ORGANIZATIONS AND INDIVIDUALS PROVIDING EXPENSE MANAGEMENT CONSULTANCY

 

Article 18. General provisions on capability conditions of expense management organization and individuals

1. Organizations and individuals must fully meet the prescribed capability conditions when providing consultancy on the following expense management jobs:

a/ Elaborating and verifying total investment;

b/ Assessing the effectiveness of work construction investment projects;

c/ Determining investment capital ratio norms, construction norms, work construction unit prices and construction price indexes;

d/ Measuring construction workloads;

e/ Elaborating and verifying work construction cost estimates;

f/ Determining bidding package prices and contract prices in construction activities;

g/ Controlling work construction expenses;

h/ Compiling contract payment and settlement dossiers;

if Compiling work construction investment capital payment and settlement dossiers.

2. The capability of expense management consultancy organizations shall be ranked at two grades and determined on the basis of number of holders of construction pricing engineer certificates in each organization.

3.  The capability of expense management consultancy individuals shall be manifested in the form of construction pricing engineer certificate.

4. Individuals who are civil servants working in state administrative agencies involved m expense management and meet the conditions prescribed in this Decree may granted a construction pricing engineer certificate; their consultancy practice must comply wilt the law on civil servants.         *

5. Expense management consultancy organizations defined by this Decision include
consultancy organizations that only perform specific jobs in expense management and other
practicing consultancy organizations performing jobs related to expense management and meet
the prescribed capability conditions.*^

Article 19. Construction pricing engineer certificates

1. Construction pricing engineer- certificate shall be granted to individuals fully meeting the conditions specified in Article 20 of    Decree.

2. Construction pricing engineer certificate are divided into grade 1 and grade 2, have uniform forms and are valid nationwide

3. Construction pricing engineer certificates shall be granted by directors of provincial-level Construction Departments under this Decree and announced on the local websites.

Article 20. Conditions for the grant of construction pricing engineer certificates

1. Conditions for an individual to be granted a grade-2 construction pricing engineer certificate:

a/ Having full capacity for civil acts, facing no ban on professional practice under decision of competent authorities, not being subject to penal liability examination nor serving an imprisonment sentence;

b/ Possessing a collegial or higher diploma in an economic, econo-technical or technical discipline or a university degree in economics, granted by a lawful organization in Vietnam or abroad, and currently performing expense management work;<

updating...
Older Documents
Online Support
Liên hệ bằng Yahoo! Messenger
If you need advice, please contact via Yahoo! Messenger to get online help.

Lawyer in Hanoi
Contact via Skype
You can use Skype to get online help
Skype Me™!
Search legal documents
Latest Documents
Advertising
Site Information

 
 
 

© Copyright: 2011 DRAGON LAW FIRM  - All rights reserved


Hotline: 1900. 599. 979

Mật ong nguyên chấtChuyên cung cấp sỉ và lẻ mật ong nguyên chất 100% tại TPHCM từ thiên nhiênDịch vụ điện hoa Hoa Tươi 360o với dịch vụ điện hoa chuyên nghiệp, giá hợp lý giúp bạn gởi đến người thân những bó hoa tươi đẹp nhấtShop hoa phong lan Hoa tươi 360o là shop hoa phong lan TPHCM chuyên cung cấp các loại hoa lan hồ điệp và địa lanHoa giỏ Hoa giỏ để bàn tạo cho không gian làm việc trở nên cực kỳ ấn tượng, được sử dụng trong các dịp như đám cưới, tặng sếp, sinh nhật....Hoa bó Hoa tươi 360o giúp bạn gởi đến bạn bè, người thân hoa bó chúc mừng sinh nhật, tốt nghiệp, hoa tặng sếp nam giá hợp lý, giao hoa miễn phí TP. HCMhoa chúc mừng Hoa tươi 360o chuyên điện hoa chúc mừng khai trương: kệ hoa khai trương, giỏ hoa khai trương... với giá hợp lý, giao hoa miễn phí trong TPHCMHoa chia buồn Hoa tươi 360o chuyên điện hoa chia buồn ở TPHCM với giá cả hợp lý, giao hoa miễn phí ở TPHCMHoa chúc mừng sự kiện Hoa chúc mừng sinh nhật, hoa chúc mừng sự kiện tặng bạn bè hoặc người thân những dịp trọng đại, giao hoa miễn phí nội thành TPHCMShop hoa cưới Hoa cưới đẹp giúp đám cưới của bạn thêm ý nghĩa. Gọi 1900 545 587 để được shop hoa cưới - Hoa tươi 360o tư vấn, giao hoa cưới miễn phí ở Bình Thạnh và tại TPHCMhoa tươi Shop Hoa tươi 360o với dịch vụ hoa tươi giúp bạn gởi đến người thân những bó hoa tươi đẹp - giá hợp lý, giao hoa miễn phí tại TPHCMĐặt quần áo đá banh Đặt quần áo bóng đá - Đặt quần áo đá banh ở TPHCM với chất lượng tốt, giá ưu đãi. Gọi 0903 009 041 để Đặt quần áo bóng đá - Đặt quần áo đá banhGiày Futsal PAN Thái LONI chuyên cung cấp các loại giày Futsal PAN Thái Lan giá rẻ trên toàn quốc. Gọi 0903 009 041 gặp MS. Nhi để đặt giày Futsal Pan Thái  giá rẻgiày đá banh cỏ tự nhiên LONI Sport chuyên cung cấp các loại giày đá banh cỏ tự nhiên giá rẻ với nhiêu mẫu mã đẹpGiày đá banh cỏ nhân tạo LONI SPORT kinh doanh sỉ và lẻ giày bóng đá, giày đá banh cỏ nhân tạo, giày futsal Pan Thái Lan với giá cạnh tranh kèm quà tặng hấp dẫngiày đá banh LONI SPORT kinh doanh sỉ và lẻ giày đá banh, giày bóng đá cỏ nhân tạo Fake1, giày futsal Pan Thái Lan với giá cạnh tranh kèm quà tặng hấp dẫnáo bóng đá - áo đá banh LONI Sport chuyên thiết kế và sản xuất quần áo đá banh, áo bóng đá ở TPHCM. Quý khách đặt áo đá banh vui lòng liên hệ: 0983 031 509 - 0903 009 041Shop quần áo đá banh - Shop bán đồ thể thao Shop bán đồ thể thao Loni Sport chuyên bán quần áo đá banh, phụ kiện thể thao như: giày đá banh, túi xách, vớ ...Gọi 0983 031 509 - 0903 009 041DỰ ÁN CĂN HỘ NEWTON RESIDENCE DỰ ÁN CĂN HỘ NEWTON RESIDENCE sẽ chính thức mở bán vào 30/2/2016. LH mua CĂN HỘ NEWTON RESIDENCE 0903414547-0933333188Thay mặt kính Ipad Thay mặt kính Ipad giá rẻ nhất TP. HCM, lấy liền có bảo hànhThay mặt kính Samsung Thay mặt kính Samsung giá rẻ nhất TP. HCM, lấy liền có bảo hànhthay mat kinh Iphone Thay mặt kính Iphone giá rẻ nhất TP. HCM, lấy liền có bảo hànhThay mặt kính Iphone 6S Thay mặt kính Iphone 6S giá rẻ nhất TP. HCM, đặc biệt chờ lấy liền. Nhận thay mắt kính Iphone 6S cho các cửa hàng Cọc khoan nhồi Nền Móng Đất Phương Nam chuyên thi công cọc khoan nhồi mini với phương pháp và thiết bị hiện đại, đội ngũ nhân viên chuyên nghiệp. Gọi ngay 0919 49 8080Phụ kiện nhà bếp Inox 304 Phụ kiện nhà bếp bằng Inox 304 do Hòa Bình Glass sản xuất và phân phối giúp cho các bà nội trợ nhanh chóng giải quyết vấn đề dầu mỡ vì dễ lau chùi, tiện lợi và nhanh chóngGương soi phòng tắm Gương soi phòng tắm do Hòa Bình Glass sản xuất từ nguyên liệu kính Guardian của Mỹ với nhiều mẫu mã phong phúPhụ kiện phòng tắm Hobig chuyên sản xuất và phân phối phụ kiện phòng tắm, liên hệ để có bảng giá sỉ phụ kiện phòng tắm phù hợp cho mọi nhàPhụ kiện nhà bếp Hòa Bình Glass chuyển sản xuất và phân phối phụ kiện nhà bếp. Liên hệ để có bảng giá phụ kiện nhà bếp cho đại lýthay mặt kính Iphone 6s Plus thay mặt kính Iphone 6s Plus giá rẻ nhất TP. HCM, đặc biệt chờ lấy liền và có bảo hành đầy đủ

Thám tử Văn phòng luật sư |   Luật sư bào chữaVietnam lawfirm |  Quảng cáo trực tuyến |  Thiết bị camera |  đại lý vé máy bay |  Thám tử hà nội | dịch vụ thám tử | Thám tử tại hà nội | thám tử sài gòn | thuê thám tử tại sài gòn | Thám tử tại sài gòn | Thám tử hải phòng | Thám tử | Thám tử tư |
quảng cáo facebook