THE GOVERNMENT

------------

 

No.81/2009/ND-CP

SOCIALIST REPUBLIC OF VIETNAM

Independence- Freedom- Happiness

-----------

Hanoi, October 12, 2009

DECREE

Amending or supplementing a number of articles of the Government’s Decree No. 106/2005/ND-CP dated August 17, 2005, which details and guides a number of articles of the Electricity Law regarding the safe protection of high-voltage power grid works

THE GOVERNMENT

Pursuant to the December 25, 2001 Law on Organization of the Government;

Pursuant to the December 3, 2004 Electricity Law;

At the proposal of the Minister of Industry and Trade.

DECREES:

Article 1.

To amend and supplement a number of articles of the Government’s Decree No. 106/2005/ND-CP dated August 17, 2005, detailing and guiding the implementation of a number of articles of the Electricity Law, regarding the safe protection of high-voltage power grid works (below referred to as Decree No. 106/2005/ND-CP) as follows:

1. To amend and supplement Clause 2 of Article 2 as follows:

"2. Upon construction or renovation of overhead electricity transmission lines stretching over population quarters, public rally places, industrial parks, hi-tech parks, export processing zones, important defense or security works, historical-cultural relics and scenic places already classified by the State, electricity and construction safety measures shall be intensified as follows:

a/ Poles must be made of steel or reinforced concrete; the safety coefficient of poles, beams and pole foundations must not be lower than 1.2;

b/ Transmission cable must not be connected within intervals of poles, except for those with a cross-section of 240 mm2 or over, which are allowed with one connection for each cable. The safety coefficient of transmission cable must not be lower than 2.5;

c/ Double insulators of the same type and same technical properties must be installed. Transmission cables and lightning-arresting wires, if being hung above insulators, must be installed with fixed support locks. The safety coefficient of insulators and accessories must satisfy currently prescribed standards;

d/ The distance from the lowest point of transmission cables in the maximum sagging state to the ground surface must not be lower than the limit prescribed in the following table:

Voltage

Up to 35 kV

110 kV

220 kV

Distance

14m

15 m

18 m

2. To amend Articles 3, 4 and 5 as follows:

"To annul the regulations on 66 kV voltage."

3. To amend and supplement Article 5 as follows:

"1. To replace the phrase "of a voltage from 66 kV" at Point b, Clause 1, with the phrase "of a voltage from 110 kV."

2. To replace the phrase "the static state" in Clause 1 with the phrase "the maximum sagging state".

3. To supplement Point d, Clause 1

For overhead transmission cables stretching over special use forests, protection forests, production forests or tree gardens, the vertical distance from the average height of fully grown trees to the lowest transmission cables in the maximum sagging state must not be smaller than that prescribed at Point c, Clause 1, Article 5 of Decree No. 106/2005/ND-CP.

4. To replace the "66-220 kV" voltage in Clause 2 with the "110 and 220 kV voltages."

4. To amend and supplement Article 6 as follows:

"Article 6. Houses and works inside or outside overhead power transmission safety corridors (below referred to as power grid safety corridors)

1. Inside up-to-220 kV power grid safety corridors

Houses and works are not required to be relocated from up-to-220 kV power grid safety corridors if the following conditions are fully met:

a/ Their roofs and surrounding walls are made of fire-proof materials;

b/ Their metal structures are earthed according to regulations on earthing techniques;

c/ They do not obstruct paths for examination, maintenance or replacement of parts of high-voltage power grid works;

d/ The distance from any part of houses or works to the nearest transmission cables in the maximum sagging state is not lower than the limits prescribed in the following table:

Voltage

UP to 35 kV

110 kV

220 kV

Distance

3 m

4 m

6 m

e/ The electric field intensity is less than or equal to 5 kV/m at any point outside the houses, which is one meter from the ground and less than or equal to 1 kV/m at any point inside the houses, one meter from the ground.

The Ministry of Industry and Trade shall detail the earthing under Point b, Clause 1 of this Article.

2. Outside 500 kV power grid safety corridors

Houses and support facilities in service of daily-life activities of households and individuals, which are located outside power grid safety corridors or in between two overhead power transmission lines of 500 kV shall be relocated with compensation or supports when either of the following conditions exists:

a/ The electric field intensity is higher than that prescribed at Point e, Clause 1 of this Article;

b/ The horizontal distance between two nearest outermost wires of two transmission lines is less than or equal to 60 meters.

3. If houses and support facilities in service of daily-life activities of households and individuals keep the distance defined at Point b of Clause 2 but the electric field intensity remains as those defined at Point e, Clause 1 of this Article and the land users and owners of assets attached to land aspire to stay, they will be allowed to stay and provided with compensations or supports for their entire residential land areas, housing spaces and support facilities in service of their daily-life activities as for the residential land, houses, support facilities in service of daily-life activities, which are located inside power grid safety corridors under Clauses 5 and 6, Article 1 of this Decree."

5. To supplement article 6a as follows:

"Article 6a. Compensation and support for houses and facilities inside power grid safety corridors

1. Owners of houses and support facilities in service of daily-life activities of households and individuals, which are not required to be relocated from up-to-220 kV power grid safety corridors under Clause 4, Article 4 of this Decree, will enjoy compensations or supports for restricted usability and impacts on daily-life activities. The compensation or supports will be paid in lump sum as follows:

a/ Houses or support facilities which are partially or fully located within power grid safety corridors and were constructed on the land eligible for land compensation according to law before the issuance of notices on implementation of high-voltage power grid projects approved by competent authorities, will be entitled to compensation or supports for the land areas lying inside power grid safety corridors;

b/ Specific compensation or support levels shall be set by provincial-level People’s Committees, but must not exceed 70% of the value of house or support facility section lying inside power grid safety corridors, at construction unit prices of new houses or support facilities of similar technical standards, which are promulgated by provincial- level People’s Committees;

c/ If houses or support facilities were built on land ineligible for land compensation according to law, provincial-level People’s Committees shall consider and provide supports based on practical local conditions.

2. For houses and support facilities built before the issuance of notices on implementation of high-voltage power grid projects approved by competent authorities:

a/ If the conditions defined in Clause 1 of revised Article 6 provided in Clause 4, Article 1 of this Decree (below referred to as Clause 1 of revised Article 6) are not statisfied, high-voltage power grid project investors shall organize the improvement to satisfy such conditions and bear the costs thereof;

b/ If only a part is demolished while the rest is still usable and satisfies the conditions prescribed in Clause 1 of revised Article 6, high- voltage power grid project investors shall pay compensations for the value of the demolished parts of houses and facilities as well as the costs of re-embellishment of the houses and support facilities under corresponding technical standards of houses and support facilities before they are demolished;

c/ If they cannot be embellished to satisfy the conditions prescribed in Clause 1 of revised Article 6, and must be demolished or relocated, house and facility owners will be entitled to compensations or supports under law."

6. To supplement Article 6b as follows:

"Article 6b. Compensation or support for land inside power grid safety corridors

For residential land and land of other types in the same lot of a land user within a power grid safety corridor, which is not subject to land recovery by the State, its user will be entitled to compensation or support for restricted usability of their land. The compensation or support will be made in lump sum as follows:

1. The residential land entitled to compensation or support for its restricted usability is the type of land defined in different legal documents on land.

2. The residential land area entitled to compensation or support for its restricted usability is the actual/and area in the power grid safety corridor. The compensation or support level must not exceed 80% of the level of compensation for recovery of residential land, calculated on the land area lying inside the corridor.

3. If the space of a land plot comprising residential land and land of other types of the same user, which is occupied by a power grid safety corridor, is larger than the residential land limit, the area of land of other types in the same land plot in the corridor is also entitled to compensation or support. The compensation or support level must not exceed 80% of the level of compensation for recovery of land of such other types, calculated on the area of land of other types lying in the corridor.

4. In case the land does not fully meet the conditions defined in Clause 1 of this Article, provincial-level People’s Committees may consider and provide supports based on practical local conditions.

5. The compensation and support levels prescribed in Clauses 2, 3 and 4 of this Article shall be specified by provincial-level People’s Committees. The fund for payment will come from investment capital of high-voltage power grid project investors."

7. To supplement Article 6c as follows:

"Article 6c. Change of the use purpose of land of other types into residential land

When land users have to relocate their houses from power grid safety corridors and wish to change the use purpose of land of other types outside the power grid safety corridors into residential land in accordance with plannings, local land management agencies shall carry out procedures to propose competent authorities to permit the change of land use purpose. The land users shall fully comply with legal provisions upon change of land use purpose."

8. To supplement Article 6d as follows:

"Article 6d. Relocation cost supports

Apart from compensations or supports for houses and facilities defined in Clause 5, Article 1 and land prescribed in Clause 6, Article 1 of this Decree, if house owners can themselves find new residential land and aspire for the relocation from the power grid safety corridor, they shall carry out the relocation by themselves and enjoy relocation cost supports according to the law on compensation, supports and resettlement upon land recovery by the State."

9. To supplement Article 6e as follows:

"Article 6e. Compensation for trees planted inside and outside power grid safety corridors

1. If trees which exist before the issuance of notices on implementation of high-voltage power grid projects and inside the power grid safety corridors are required to be felled and new planting is banned under Clause 3, Article 5 of Decree No. 106/2005/ND-CP, they will be entitled to compensation under current regulations.

2. If trees which exist before the issuance of notices on implementation of high-voltage power grid projects and inside the power grid safety corridors are not required to be felled and new planting is allowed under Clause 3, Article 5 of Decree No. 106/2005/ND-CP or trees which stand outside the power grid safety corridors but threaten to infringe upon the safety distances defined in Clause 2, Article 5 of Decree No. 106/2005/ND-CP, the power grid-managing and/or-operating units can examine, fell or trim such trees to ensure safety for the overhead power transmission lines and pay compensations according to regulations.

3. Compensations for cases prescribed in Clauses 1 and 2 of this Article will be paid in lump sum for a tree and the compensation levels will be set by provincial-level People’s Committees to suit local practical conditions."

Article 2.

Implementation responsibilities

Ministers, heads of ministerial-level agencies, heads of government-attached agencies, chairpersons of provincial-level People’s Committees and concerned organizations and

Individuals shall implement this Decree.

Article 3.

Implementation effect

1. This Decree takes effect on December 1, 2009.

2. Investment projects for construction of high-voltage power grids which have been implemented before the effective date of this Decree will continue to be implemented in accordance with the approved technical designs.

3. For projects and works with approved compensation and support schemes under which compensation or supports have not yet been implemented or completed before the effective date of this Decree, the compensation and support values shall be adjusted under this Decree.

 

ON BEHALF OF THE GOVERNMENT

PRIME MINISTER

(Signed and sealed)

NGUYEN TAN DUNG

(This translation is for reference only)

 

 Vietnam Lawfirm, Vietnam Law, Hanoi Law, Lawfirm, Dragon Lawfirm,

Lawyer, Lawyers, Hanoi Lawyer, Saigon Lawyer, Vietnam Lawyer

www.lawfirm.vn

 

updating...
Older Documents
Online Support
Liên hệ bằng Yahoo! Messenger
If you need advice, please contact via Yahoo! Messenger to get online help.

Lawyer in Hanoi
Contact via Skype
You can use Skype to get online help
Skype Me™!
Search legal documents
Latest Documents
Advertising
Site Information

 
 
 

© Copyright: 2011 DRAGON LAW FIRM  - All rights reserved


Hotline: 1900. 599. 979

Mật ong nguyên chấtChuyên cung cấp sỉ và lẻ mật ong nguyên chất 100% tại TPHCM từ thiên nhiênDịch vụ điện hoa Hoa Tươi 360o với dịch vụ điện hoa chuyên nghiệp, giá hợp lý giúp bạn gởi đến người thân những bó hoa tươi đẹp nhấtShop hoa phong lan Hoa tươi 360o là shop hoa phong lan TPHCM chuyên cung cấp các loại hoa lan hồ điệp và địa lanHoa giỏ Hoa giỏ để bàn tạo cho không gian làm việc trở nên cực kỳ ấn tượng, được sử dụng trong các dịp như đám cưới, tặng sếp, sinh nhật....Hoa bó Hoa tươi 360o giúp bạn gởi đến bạn bè, người thân hoa bó chúc mừng sinh nhật, tốt nghiệp, hoa tặng sếp nam giá hợp lý, giao hoa miễn phí TP. HCMhoa chúc mừng Hoa tươi 360o chuyên điện hoa chúc mừng khai trương: kệ hoa khai trương, giỏ hoa khai trương... với giá hợp lý, giao hoa miễn phí trong TPHCMHoa chia buồn Hoa tươi 360o chuyên điện hoa chia buồn ở TPHCM với giá cả hợp lý, giao hoa miễn phí ở TPHCMHoa chúc mừng sự kiện Hoa chúc mừng sinh nhật, hoa chúc mừng sự kiện tặng bạn bè hoặc người thân những dịp trọng đại, giao hoa miễn phí nội thành TPHCMShop hoa cưới Hoa cưới đẹp giúp đám cưới của bạn thêm ý nghĩa. Gọi 1900 545 587 để được shop hoa cưới - Hoa tươi 360o tư vấn, giao hoa cưới miễn phí ở Bình Thạnh và tại TPHCMhoa tươi Shop Hoa tươi 360o với dịch vụ hoa tươi giúp bạn gởi đến người thân những bó hoa tươi đẹp - giá hợp lý, giao hoa miễn phí tại TPHCMĐặt quần áo đá banh Đặt quần áo bóng đá - Đặt quần áo đá banh ở TPHCM với chất lượng tốt, giá ưu đãi. Gọi 0903 009 041 để Đặt quần áo bóng đá - Đặt quần áo đá banhGiày Futsal PAN Thái LONI chuyên cung cấp các loại giày Futsal PAN Thái Lan giá rẻ trên toàn quốc. Gọi 0903 009 041 gặp MS. Nhi để đặt giày Futsal Pan Thái  giá rẻgiày đá banh cỏ tự nhiên LONI Sport chuyên cung cấp các loại giày đá banh cỏ tự nhiên giá rẻ với nhiêu mẫu mã đẹpGiày đá banh cỏ nhân tạo LONI SPORT kinh doanh sỉ và lẻ giày bóng đá, giày đá banh cỏ nhân tạo, giày futsal Pan Thái Lan với giá cạnh tranh kèm quà tặng hấp dẫngiày đá banh LONI SPORT kinh doanh sỉ và lẻ giày đá banh, giày bóng đá cỏ nhân tạo Fake1, giày futsal Pan Thái Lan với giá cạnh tranh kèm quà tặng hấp dẫnáo bóng đá - áo đá banh LONI Sport chuyên thiết kế và sản xuất quần áo đá banh, áo bóng đá ở TPHCM. Quý khách đặt áo đá banh vui lòng liên hệ: 0983 031 509 - 0903 009 041Shop quần áo đá banh - Shop bán đồ thể thao Shop bán đồ thể thao Loni Sport chuyên bán quần áo đá banh, phụ kiện thể thao như: giày đá banh, túi xách, vớ ...Gọi 0983 031 509 - 0903 009 041DỰ ÁN CĂN HỘ NEWTON RESIDENCE DỰ ÁN CĂN HỘ NEWTON RESIDENCE sẽ chính thức mở bán vào 30/2/2016. LH mua CĂN HỘ NEWTON RESIDENCE 0903414547-0933333188Thay mặt kính Ipad Thay mặt kính Ipad giá rẻ nhất TP. HCM, lấy liền có bảo hànhThay mặt kính Samsung Thay mặt kính Samsung giá rẻ nhất TP. HCM, lấy liền có bảo hànhthay mat kinh Iphone Thay mặt kính Iphone giá rẻ nhất TP. HCM, lấy liền có bảo hànhThay mặt kính Iphone 6S Thay mặt kính Iphone 6S giá rẻ nhất TP. HCM, đặc biệt chờ lấy liền. Nhận thay mắt kính Iphone 6S cho các cửa hàng Cọc khoan nhồi Nền Móng Đất Phương Nam chuyên thi công cọc khoan nhồi mini với phương pháp và thiết bị hiện đại, đội ngũ nhân viên chuyên nghiệp. Gọi ngay 0919 49 8080Phụ kiện nhà bếp Inox 304 Phụ kiện nhà bếp bằng Inox 304 do Hòa Bình Glass sản xuất và phân phối giúp cho các bà nội trợ nhanh chóng giải quyết vấn đề dầu mỡ vì dễ lau chùi, tiện lợi và nhanh chóngGương soi phòng tắm Gương soi phòng tắm do Hòa Bình Glass sản xuất từ nguyên liệu kính Guardian của Mỹ với nhiều mẫu mã phong phúPhụ kiện phòng tắm Hobig chuyên sản xuất và phân phối phụ kiện phòng tắm, liên hệ để có bảng giá sỉ phụ kiện phòng tắm phù hợp cho mọi nhàPhụ kiện nhà bếp Hòa Bình Glass chuyển sản xuất và phân phối phụ kiện nhà bếp. Liên hệ để có bảng giá phụ kiện nhà bếp cho đại lýthay mặt kính Iphone 6s Plus thay mặt kính Iphone 6s Plus giá rẻ nhất TP. HCM, đặc biệt chờ lấy liền và có bảo hành đầy đủ

Thám tử Văn phòng luật sư |   Luật sư bào chữaVietnam lawfirm |  Quảng cáo trực tuyến |  Thiết bị camera |  đại lý vé máy bay |  Thám tử hà nội | dịch vụ thám tử | Thám tử tại hà nội | thám tử sài gòn | thuê thám tử tại sài gòn | Thám tử tại sài gòn | Thám tử hải phòng | Thám tử | Thám tử tư |
quảng cáo facebook